Skip to main content

Free tools

Calculators

One free tool, with no sign-up and no data sent anywhere: all the maths happens in your browser.

This calculator runs entirely in your browser. Nothing you enter is transmitted to us.

What flow rates does your home need?

NBN D50-001 derives a room's flow rate from its floor area: 3.6 m³/h per m², constrained between a minimum and a maximum specific to the room type. Enter your rooms below.

  • Supply

    108m³/h

  • Supply

    50m³/h

  • Supply

    40m³/h

  • Extract

    50m³/h

    value raised to the standard's minimum · 43 m³/h

  • Extract

    50m³/h

    value raised to the standard's minimum · 22 m³/h

  • Extract

    25m³/h

Total supply air
198m³/h
Total extract
125m³/h

Your need for fresh air (living rooms) and for extraction (wet rooms) differ a lot. A heat-recovery unit supplies and extracts the same amount of air: you therefore size it on the larger of the two totals.

Indicative result, provided for information. For a project under EPB regulations, the reference calculation is the one produced by the EPB reporter appointed to your project.

And in reality, does your system reach those values?

Want to know whether your ventilation really reaches these values? Take the “airflow check” option (20 €) when booking your service: we measure the air at every valve to spot any anomaly and confirm that everything is in order.

What your region requires

Flow rates are calculated to NBN D50-001 everywhere. What changes between regions is how compliance is verified on a project.

RegionWhat appliesWho is responsible
Brussels-Capital RegionVentilation provisions required in new build and certain renovations fall under Brussels EPB regulations. Flow rates are calculated to NBN D50-001.The EPB adviser appointed to the project
Walloon RegionHygienic ventilation is part of Walloon EPB requirements, with minimum flow rates set by room area and use, in line with NBN D50-001.The project's accredited EPB officer
Flemish RegionFlanders goes further than the other two regions: since 2016, every EPB-regulated project requires an accredited ventilation reporter, separate from the EPB reporter. They produce a pre-design before works, then measure actual flow rates after installation.An accredited ventilation reporter, alongside the EPB reporter
Indicative information, applying to projects governed by EPB regulations. Procedures change and have exceptions: check with your region's authority, linked below.
Book

How would you like to reach us?

Or leave us a message

You are

Your data is used solely to handle your enquiry. It is never sold or used for advertising.